2013年8月23日星期五

Three-phase transformer capacity expansion

With growing urbanization, the urban population continues to expand, demand for electricity is also increasing. Power shortage problem is most evident in summer and winter peak demand, substantial growth in air circuit breaker for electricity, make the city grid overwhelmed. Temporary measure only temporary solutions urgent needs, electric meter is the fundamental solution. Electric energy meter transformation of power facilities, expanding capacity, so that it can meet the urban population in the peak demand for electricity.

没有评论:

发表评论